Drying a basement or apartment usually takes two to five days, depending on how much water was present, the materials involved, and the ventilation in the space. NYC basements and ground-level apartments often require additional time because humidity stays trapped. GreenRoom Remediation uses industrial dehumidifiers, air movers, and moisture meters to confirm the structure is fully dry before the equipment is removed.