24-HOUR EMERGENCY SERVICECall now: (917) 965-3754

From GreenRoom’s project collection

Before & after.
The work behind the walls.

See how selective material removal changes a work area. These matched photographs show the same spaces before wall openings and after the removal stage, with retained finishes and project boundaries visible.

01 / Hallway · August 2026

Opening the lower wall and floor area.

The first image shows the corridor before the lower wall is opened, with a taped horizontal work line and carpet still in place. The later photograph shows exposed metal framing and the adjacent floor after the carpet has been removed.

Before the wall opening
Hallway with a yellow taped work line before lower wall and carpet removal
The lower wall and carpet are still present along the marked work area.
After selective removal
Same hallway after lower wall sections and adjacent carpet have been removed
The lower wall cavity and floor substrate are exposed; the upper wall and doors remain.

What changed

The comparison shows the removal boundary along the lower wall and the extent of the adjacent floor opening. The upper wall finishes and doorways remain in place.

Planning similar work

A water-damage scope should explain which materials will be removed, what will be retained and how drying and repairs will be handled.

Explore water damage restoration →

02 / Shared reception area · August 2026

Retaining the counter while opening the walls.

These views show the same reception area from different angles. The stone counter, hanging lights and glass entrance remain recognizable. In the later photograph, wall sections have been opened and plastic sheeting is taped across the exposed areas.

Before wall removal
Reception counter, three pendant lights and finished walls before selective wall removal
The reception counter and finished wall surfaces before the wall-opening stage.
After wall removal
Same reception area after wall removal with plastic sheeting over exposed wall sections
Opened wall areas are covered with taped plastic sheeting around the retained counter.

What changed

The wall finishes have been removed in selected areas while the central counter, lighting and entrance remain in place. The photograph documents the visible work stage and the covered openings.

Planning similar work

Clarify removal limits, retained fixtures, access arrangements and the required completion review before a remediation project begins.

Review our mold remediation process →

Serving all five NYC boroughs

Let’s plan the work at your property.

Share your location, the affected areas and any assessment or leak-repair information. We’ll discuss the scope, access and next steps.